Traffic Advisory: Route 83 is closed in Vernon, between Loveland Hill and Windsorville Roads, because of downed power lines.

Route 17

workzone

Arrigoni Bridge Work Begins This Month

The Arrigoni Bridge over the Connecticut River between Middletown and Portland will be reduced from four lanes to two for about 18 months starting June 28, as crews replace the deck of the bridge, which dates to 1938.

06/17/2011

Follow

Get every new post delivered to your Inbox.

Join 876 other followers